2.5. Pressure Surge Damper RK-F10 153
In case of a requirement that single duct legs or wall openings has to be open in normal operation and to be closed in a pressure wave (produced by chemical reactions, gas-explosions or mechanical damages at pressure vessels) resp. a pressure increasing
One of Germany's largest hard coal fired power plants is taken off the grid //
Employee program 'Out of work, into work' successful // Dismantling will take several
years
Voerde. After 47 years, last Friday one of the largest hard-coal-fired power plant sites in Germany was officially taken out
Group subsidiary SENS to develop major photovoltaic project in Sicily
STEAG Solar Energy Solutions (SENS), the most recent subsidiary of the Essen-based STEAG Group, is growing steadily in the field of renewable energy. Last Tuesday, André Kremer, Managing Director of SENS, and Matej Lednicky,
600-tonne crane inserts gas turbine in STEAG’s new-build plant
Herne/Essen. After an eleven-day waterway journey from Berlin to Herne, the gas turbine for STEAG’s new power plant arrived on Monday and was placed in the boiler house by a crane. The 457-tonne heart of the environmentally friendly
Year in, year out: STEAG trainees donate to a good cause
Essen. STEAG trainees present donation to Jugendwerk Essen. Energy company trainees raise funds for children from disadvantaged families through the sale of Advent calendars.
By selling Advent calendars to their colleagues, trainees at the
Six companies, five of them from the Saarland, have jointly applied for IPCEI funding. The aim of the individual projects is to develop a green hydrogen economy in the Saarland, France and Luxembourg.
Saarbrücken/Völklingen/Dillingen/Homburg/Essen/Munich. The energy company STEAG, the plant
Power plants Bexbach and Weiher return from grid reserve, power plants Bergkamen and Völklingen-Fenne, who were designated for permanent shutdown, continue operations
Essen. STEAG is returning both its hard coal fired power plants Bexbach and Weiher in Saarland from the grid reserve to the market.
STEAG reaches important milestones in the first construction section
Essen. The first construction section in the expansion of the district heating network in Essen, operated by STEAG, is totally on schedule. With the successful crossing below Schützenbahn street, an important step towards
Investment volume will be in the mid three-digit million euro range
Herne, Germany. The project company STEAG GuD Herne GmbH has reached agreement with Munich-based Siemens AG on the turnkey construction and long-term servicing of the planned combined cycle power plant at STEAG’s power plant site
STEAG SENS and KGAL building more PV parks on Sicily and in southern Spain
Würzburg/Essen/Palermo/Madrid. Würzburg-based STEAG Solar Energy Solutions GmbH (SENS) steps up its cooperation with the prestigious investor KGAL: plans for a solar project in Sicily receive another substantial extension in
5.2 Ventilation unit (recirculated air) for mixing ventilation LG-UM-M-LB, for horizontal floor mounting 201
To ventilate office and administrative buildings that have façades with floo-to-ceiling glazing, Krantz supplies a ventilation unit work- ing with recirculated air and designed for raised
4.12 Rectangular floor displacement outlet Q-BR 187
Data
Supply air volume flow rate up to 55 l/(s·m) [200 m³/(h·m)] Temperature difference supply air to indoor air –1 to –6 K Unit length 800, 1 000, 1 200 (standard), 1 450, 1
Cogeneration ensures high efficiency
Essen. Together with the steel producer ArcelorMittal Bremen GmbH, the Essen-based energy company STEAG GmbH is developing a tailor-made and resource-saving energy concept for the coking plant location in Bottrop. The heart of the generation system for
STEAG no longer sees any economic prospects for the hard coal-fired generating units 6 and 7 in Lünen. One power plant unit in Völklingen, Saarland, is to be taken off the grid temporarily for seasonal reasons.
Essen. Energy company STEAG today filed a legally binding notice with the German
Photovoltaics subsidiary SENS presents software for predictive and earnings-optimized operation of solar installations
Essen/Munich/Würzburg. At the Intersolar Europe trade fair in Munich, STEAG Solar Energy Solutions GmbH (SENS), a subsidiary of the Essen-based energy company STEAG, is presenting
Contracts signed for the second part of the energy system at the refinery in Gelsenkirchen-Scholven
Gelsenkirchen/Essen. The Essen-based energy company STEAG GmbH has been appointed by the bp subsidiary Ruhr Oel GmbH – BP Gelsenkirchen to take on the design and construction of a water treatment
Carsten König newly appointed to the energy company's management board
Essen. The Essen-based energy company STEAG is consistently pushing ahead with its reorientation towards growth areas beyond its previous core business. To this end, the supervisory board of STEAG GmbH has appointed Carsten
Supervisory Board appoints three new directors for the Essen-based energy company
Essen. The Supervisory Board of STEAG GmbH has appointed new members to three positions in the company’s Board of Management for the coming years. In addition to Dr. Wolfgang Cieslik and Alfred Geißler, the previous
CFO Dr. Heiko Sanders steps down / CTO Ralf Schmitz takes on additional responsibility for Finance
Essen. Dr. Heiko Sanders, 52, Chief Financial Officer of STEAG GmbH since May 2020, is leaving the Essen-based energy company with effect from September 15, 2021, at his own request and by mutual