4.3 Chilled beam DK-F, without ventilation function 228
Data
Nominal width 300, 400, 500 and 600 mm Nominal height 180 und 250 mm Nominal length 1 200, 1 500, 1 800, 2 100, 2 400, 2 700 and 3 000 mm Surface finish DK-FZ: primed similar RAL 9011
STEAG 2022 transformation program systematically implemented EBIT rises by 60 percent to 197 million euros Consolidated result well in the black at 59 million euros 45 million euros in profits transferred to the municipal shareholder KSBG Investments in new growth areas pay off
STEAG exceeds its
STEAG subsidiary Krantz provides four units for coronavirus prevention
Oberhausen/Aachen/Essen. Peacevillage International, a globally recognized non-profit organization that has been helping injured and sick children from war and crisis zones all over the world for decades, has received four
For the closure auction for hard coal fired power plants taking place at the beginning of September, the Essen-based energy company is seeking to have the volume substantially increased and the compensation awards declared provisional.
Essen. STEAG today submitted an urgent application to the
2.1 Static cooling ceiling system SKS-4/3, for concealed installation 214
Data
Nominal length 1 000 mm - 4 000 mm Nominal width 350 mm - 1 475 mm Nominal height 85 mm Pipe spacing 125 mm Connection type push-in fitting or press
STEAG and the Entsorgungsverband Saar municipal waste disposal association are tapping the potential of the AVA Velsen waste-to-energy plant for regional district heating supply
Saarbrücken. Saarbrücken-based STEAG New Energies GmbH and Fernwärme Verbund Saar GmbH (FVS), together with
1.3 Multifunction ceiling KrantzCool 225
The multifunction sail KrantzCool has been developed for suspension close to the concrete ceiling and is characterized by its extremely compact design. Due to reflow of secondary air above the ceiling sail, a uniform appearance of the ceiling sail with
Decision made after thorough reassessment of economic viability
Essen/Quierschied/Bexbach. Essen-based energy company STEAG today notified the Federal Network Agency of its plan to permanently shut down its two power plant units Weiher 3 and Bexbach in the Saarland. The statutory publication on the
Innovative energy solution for Saarland municipalities Camphausen and Sulzbach
Camphausen/Sulzbach/Saarbrücken. STEAG New Energies GmbH, a Saarbrücken-based subsidiary of the Essen energy company STEAG GmbH, is planning an innovative CHP facility at the site of the former Camphausen underground
Upcoming felling of diseased trees at Troisdorf landfill site / Replanting to follow immediately
Troisdorf/Gladbeck. Diseased trees that are no longer safe due to damage caused by storms or high temperatures or on account of pest infestation are to be felled at the Troisdorf landfill site in the
STEAG subsidiary SENS constructs a photovoltaic system for Essen’s waterworks
Essen/Würzburg. For Wassergewinnung Essen GmbH, a subsidiary of the Stadtwerke Essen AG and Gelsenwasser AG municipal companies, sustainability and the conservation of resources are central cornerstones of its activities.
Regenerative thermal oxidiser after biogas treatment 433
A local energy supplier operates a biogas generation system. To satisfy the strict requirements of the Energy Feed Act, the raw biogas produced from organic substances needs to be cleaned before it is fed into the natural gas network. The
Five STEAG apprentices from the training workshop in Herne pass examinations ahead of schedule with good to excellent grades
Herne/Essen. Since 2020, STEAG’s industrial and technical training in North Rhine-Westphalia has been centralized and conducted in a newly built training workshop in Herne.
Regenerative Thermal Oxidiser 252
The regenerative thermal oxidation is a very efficient technique to clean exhaust air in all kinds of Industries that are working with solvents.
Features
Regenerative thermal oxidisers for the cleaning of industrial exhaust air using ceramic heat storage
STEAG subsidiary building 50-megawatt solar farm in Norfolk
King’s Lynn/Essen/Würzburg. STEAG Solar Energy Solutions GmbH (SENS), a subsidiary of Essen-based energy company STEAG and a specialist for PV projects, will be building a solar farm with output of 50 megawatts (MWp) in the eastern English
Concentration 250
For the exhaust air treatment of large exhaust air volume flows with low solvent load and temperatures < 40 °C in combination with a thermal exhaust air cleaning unit.
Features
Concentrator units combined with thermal oxidisers, regenerative thermal oxidisers or catalytic
STEAG PV-subsidiary SENS and LSG GROUP complete 65 MWp in Eastern Europe
Essen/Würzburg. Together with its Austrian partner in this project, the LSG GROUP, STEAG Solar Energy Solutions GmbH (SENS) has added 130 solar parks with a total capacity of 65 megawatts (MWp) to the Hungarian power grid
Proceeds from STEAG trainee fundraising campaign donated to Caritas Essen
Essen. In light of Russia’s invasion of Ukraine and the vast number of Ukrainians fleeing to Germany on account of this brutal war of aggression, the fourteen commercial trainees based in Essen decided to support the refugee
Retaining a 51 percent stake, STEAG remains majority shareholder and continues to be in charge of commercial and technical management of the wind farms
Essen. Essen As part of its active portfolio management, the Essen-based energy company STEAG is selling a 49 percent stake in its wind farm
Krantz GmbH has a broad spectrum of international customers and fields of activity. The guiding principles, across all areas, are always the satisfaction and success of our customers and thus also the success of our company.
This is directly linked to the well-being of our employees and the